Work package 2 (WP 2) - Collection of information and requirement
specification
This package consists of
preparatory information acquisition in terms of both current regulations and
existing solution strategies and states of the art for the use of
lightweight materials in vessels. In addition, it includes the preparation
of performance specifications for the WP3 concept studies. SP is the WP3
package manager.
|
|